Answer Posted / srinivasansureshkumar
Control valve: Also called as final control element /
variable orifice (Restrictor) in a flow line.
Principle of operation : Motion Balance Principle.
Breif Description: The control valve consists of
1. Actuator (Provides power to drive the valve otion)
2. Range spring (Its the one dictates the operating range
of valve)
3. yoke (Supports the Actuator to valve boby)
4. Valve Body (where plug & Seat in there throttles the
flow according to the position between them)
** The signal provided to the actuator drives the actuator
stem which is coupled to the plug stem. this motion occurs
opposing the range spring until the resultant force
generated by the actuator and range spring nullifies.
The resultant is the travel position of the valve.
Is This Answer Correct ? | 33 Yes | 2 No |
Post New Answer View All Answers
why we are not using the turbine flow meter in the steam service?
what is moisture probe? What are there types? What is there working principle and how they works? guys this is one of technical question I had ask in interview. If you know its answer please let me know. The interviewers were more interested in microwave moisture probe, so if you find its any link please just forward me on my mail id.avinash1200@gmail.com Thanks in advance.
can we create an interrupt in plc through scada?
When doing a liquid seal on a differential flow transmitter , most of the time the sealing liquid will be heavier then the process fluid. For wich application will the sealing liquid be lighter than the process fluid if transmitter is mounted below the process line.
What is the diffrence between ff tx and non ff tx
what is the process to make control schematic ?
it is possible to check the fail safe condition in pressure transmitter. if possible how?
in sulfur process what is material of impulse line we use to connect with transmitter ? and does teflon affected by sulfur?
What is standard of DCS panel design?and what is step of DCS panel design?wiring and type of connector(screw or DB connector)
how will you segregate the alarm levels in alarm management system during factory Acceptance Test
Isometric drawings are generated during _________________ phase of a project
anybody having Qatar Petroleum questions for instrument Technician offshore ....please send me
hello can yoy pls send me previous papers of jindalpower and steel ltd.....'m from instrumentation..... mani1048@gmail.com
Explain the difference between mmwc and mmwg?
WHAT IS THE DIFF. BETWEEN SKIN TEMPERATURE AND PASSES TEMPERATURE..?