HOW WAS EVERYBODY'S SBI PO (MAINS).....HELD ON 30 NOV 2008?
Let us share our views here....
Answer Posted / ranjit
i too cleared it.....
can anybody tell how gd pi would be taken?
u can reply me on ranjit18jul@gmail.com
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
I have entered a wrong percentage in bank of baroda clerk exam,by mistake i have entered 74 instead of 64%.I want to know whether it could be corrected at the time of interview or not.I have done well in exam and i hope i will clear the exam.Pls reply soon.
I forgot my E-mail ID Password. So, anyone send me the date for clerical interview for SBI.My Email id is dhanssmailbox@gmail.com
bakit po lalaking seahorse ang nagdadala ng baby seahorse
Is it right to leave TCS & join Accenture for 2 years experienced Software Professional ?
Can any one solve this one?? **A server configuration is controlled from a single web page with multiple options: 20 drop-down menus, with 3-4 options each. 5 check-boxes. 1 multi-select menu, with 5 options. 1 template selection, with 6 options: A, B, C, D, E, F. o When options A, B, C, D are selected, all options (#1-#3) above are available. o When options E, F are selected, only 10 out of 20 drop-down menus have an effect. Besides item #4, developers input is that all options are independent, I.e., not impacting each other. What is the required number of test configurations required in order to test the server configuration and release in good quality: Assuming first release. Assuming regression tests for release with new features not impacted by the above options. Test configuration is a complete set of options that were selected to be tested in one complete server configuration scenario. I.e, a test configuration is set of 17 or 27 specific options tested together.
Thyristor convertor type AVR(Automatic Voltage Regulator) is made of Thyristors(Silicon Controlled Rectifiers,SCRs). We know that output DC voltage from an SCR will not only depend upon the r.m.s. value of Input voltage applied, but also at the angle at which the input AC cycle is fired (using gate signal). If the firing angle is zero(in a simple circuit), then maximum DC output voltage will be obtained.If the firing angle is changed from 0 to 180,then maximum to minimum voltage is obtained. This property could be used to build an AVR. The firing angle proportional to Output voltage could be used to trigger the thyristor,in a closed loop manner and a nearly constant DC voltage(Average Value) can be obtained.An invertor circuitory could be utilised to get a regulated AC supply. Many other configurations can be build from thyristors to get a regulated AC supply.
why you want to quit your current job?
what environmental performance criteria are used in your company
I heard about online data entry job and is this job safe, legal to do at home. How I will find a good online job to do at home ?
how to measurement a horizontal water tank in ltr ?
What is the salary in railway in group c with grade pay 2400?
I have an interview with capital iq for the post of research associates. Can anyone please help me with the type of questions that they can ask? Please, it's urgent. Thank you.
What is valley, Playa, Catchment area, Basin ? please describe with picture.
what is the diffreence between sales insurance and other marketing ?
which is the best engineering college in vijayawada