Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

WHAT SHOULD BE THE MINIMUM IR VALUE FOR LV (380V) CABLES
ACCORDING TO IEC/IEEE.

Answer Posted / rekha

1mega ohm

Is This Answer Correct ?    4 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What type interview questions ask in Electrical technicians

1877


1.What will be stored in online ups EPROM IC?

2100


How can we increase fuel-power ratio of any DG set?

1857


how to find ratio of CT & PT in 66/11kv 12 mva supply system ? explain with calculation.

2475


State how to produce a constant rotating field by application of alternating currents to stator armature of a three-phase squirrel-cage induction motor

2553


How to check the LM324 Ic

8529


Difference between ac parallel circuit and ac series circuit?

2188


how commomn gate triggering is given for TRIAC ? other thyristor wont be efffected?

2484


what you have to see after one week or month from the day of installation of transformer ?

1753


what could be the RMS value and average value of a 4 phase sine wave?

1923


A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.

1842


What is principle of Floroscent tube 36watt.

2118


I am an American living in Vietnam and I have recently gotten a refrigerator from Japan and it is rated for 100 vac, but the power here is 220 so I bought a voltage stabilizer it has a 1 kva output rating. Can you please tell me what the amperage is? I'm confused and without a working fridge.

1780


if a 3phase 100kva distribution transformer , 400 v,50 hz, 4-wire system is loaded at 160 k.w mostly 1-phase Lighting & Airconditioning split a.c load what will be the net effect on the power system in terms of voltage, powerfactor, current , efficiency of xformer

1944


What are the differences between single phase and three phase?

2099