Answer Posted / cp shrivastava

first we would done investigation of soil for quality of
soil streta, bearing capicity of soil then as per our
requairment as per building by law we may design foundation
for as per area how much floor we required

Is This Answer Correct ?    11 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to arrive dry volume of concrete (1.52 to 1.57) ?

1988


quantity of material needed for rubble stone masonry for 1:4 and 1:6

1344


How to find weight of steel in kg if we know the area which is in m2? Following details are known to us, Area=125m² thk of slab=250mm Steel details:T12@200 PS:considering mesh top and bottom with X and Y direction

2736


What is the nature of duties & responsibilites senior civil engineer ?what is self confident & satisfaction should be a senior civil engineer?

1800


Which are the top apps for you civil engineer?

818






how to control PQI (Project Quality Index)

10021


5. Do you feel that your present employer estimates your full work potential? Are they pleased with your work performance?

8613


How good are the Weinerberger Porotherm bricks that are being used in construction in Chennai, India. Its being used in non load bearing walls and has a compressive strength greater that 35 kg/cm^2 and a density of approx.694 - 783 kg/m3.

2317


please give me the rates of RCC(CUM), PCC(CUM), Brick Work(CUM), Tile Flooring, Saria Shuttering

1182


How you can use different dimension tools in cad? What are the different dimensions available?

764


what are the layers of the national and heir aprox thickness??

1686


I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

1733


What you understand by building codes?

782


WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)

3354


Give list of building construction equipment & explain about them in brief. How much is output of JCB, POCLAIN, Steel cutting & bending machine, material hoist, tower crane?

2692