in communication what is the role of elelctrical engineer?
Answer Posted / meghraj kabdule
The Electrical Engineer can play role in SCADA system of
power Plants.Telecommunication of EHV Substation. RTU
work.etc.
Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
please send me latest & previous years question papers for IOCL Technical level questions
Advantages of using generator circuit breaker (GCB) scheme in a power station ?
after how many spot we must chang secondry cable in portable spot welding gun?
Is single load(eg: three phase motor) having all the components like positive,negative,zero sequence components during fault condition?
Sir, I have applied for the of Jr.engineer(Electrical & Electronics) & ASST. LOCO PILOT at ALL RRB BOARDS. please send me all RRB Boards solved papers in the year of 2001 tO till date. i requested send me the papers to my id as soon as possible (jet_0991@yahoo.com). (This is very urgent) Thank You,
What is the method for testing the differential protection stabilty in generator? When the time of starting What will happen if differentail protection connection wrong means?
Difference between megger test equipment and contact resistance meter test instruments?
What is the de rating factor of cable? What is the importance of the de rating factor in cable selection?
A d.c. Shunt motor is found suitable to drive fans because they require?
Define corner frequency?
How many gap between finger contact in a.c.b. and v.cb.?
Hi Friend I am used multimeter to measure the voltage between R Phase(SS1) to R Phase(SS2). In SS1 is connected with UPS loads. But I am getting voltage between these 2 R Phases. Please give some idea friend
The Howland current source produces a A Unidirectional floating load current B Bidirectional single-ended load current C Unidirectional single-ended load current D Bidirectional floating load current
We have received supplies of the ordered material. payments against the supplies also released. Where ST paid 4% against form C. Meanwhile it has been observed that 25% of material supplied was defective. Please suggest whether the issuance of C form from our side would be stopped till settlement of liabilities.
What is minimum phase system?