Answer Posted / sudhakar.a
It is the process to determining the ingredients of
concrete like cement,sand and aggregate in order of
proportion (i.e)1:2:4,1:3:6,1:4:8,1:5:10
| Is This Answer Correct ? | 0 Yes | 5 No |
Post New Answer View All Answers
What is the use of water table & Kreb stone for drain
Who name us Engineer & Why?
Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required
I am in India. Employer A got approval for my H1. But they have no job for me now. Company B is going to file H1 for me. They do not know about company A. Is there any way that I get approved H1 of company A transferred to Company B?
What is the minimum size of the particles of silt soil?
How do you calculate load bearing capacity of a waffle slab?
What are your future hopes for this job?
Explain what is Critical Path Method (C.P.M)?
for G+2 residential building how much quantity of required in foundations,sub & superstructures per sq ft area
The portion of a brick cut across the width is called?
how much cement and sand required for 100sqm of wall plastering in different proportions
Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.
can i get hindi version of is codes based on civil engineering?
What is semirigid connections?
How to construct a water sump in a rocky soil?