when does sedimentation occur
before filteration, along with it, along with chlorination,
after chlorination?

Answer Posted / sunil kumar

Sedimentation is a process the treat of water .it occur
before flocatation and then provided the filtration step.

Is This Answer Correct ?    1 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No.       Loading        Axial force      Moment     Shear 1               DL+LL          1950              600            20 2           Seismic load       250              4800          700

1524


how to estimate material requirement for an area of house in square feet?

1736


do we consider shrinkage factor for calculating cement consumption for CM mixes for different works?

1237


what values & beliefs have guided you in your career path

2775


why is M25 and Fe 500 assumed to be most economical? i feel it is not.This is because higher grade of concrete and steel has higher lapping length and anchorage length compared to lower grades..

2083






How to find beam R/F cutting length

1229


give me the rate analysis for Bituminous Macadam and SDBC

6939


How many square meter can mason layout chb per hour

1805


what is constat for brickwork

1687


How can explode a block?

681


Difference between lime, distemper and plastic emulsion?

1233


What are moment of inertia and its importance in civil engineering?

696


how to calclate the SHUTTERING TAKEN CONCRETE LOAD? WHAT IS THE LOAD BEARING CAPACITY IN STEEL SHUTTERING PLATE? WHAT IS THE CONCRETE LOAD IN (MASS) IN THE SHUTTERING PLATE. PLATE SIZE IS 120CM* 90CM CONCRETE WALL LENGTH IS 10M ,WIDE IS 60CM, HEIGHT IS 1.2M PLS TO SENT THE CALCULATION.

10582


cement required for construction of 400mm*200mm*200mm concrete solid blocks for 1sq.mtrs,how?

1888


at what pressure ply-wood is obtained by gluing wooden sheets

2097