As an engineer, what u should do when the construction of a
building doesn't meet the required specifications?
Answer Posted / rqn
if you are with the inspection team, the proper way is to
deduct the cost of the item involve based on the gravity of
damage, however, you have also to consider on the effect of
the item involve with respect to the time element in
completing the project and the structural stability.
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
Define What are the uses of alloys in daily life and how are alloys made?
16 questions out of 55 were from the book GUPTA N GUPTA OBJECTIVE of civil engineering. Total ques were 4 ques from hydraullics, 7 from BMC, 4 FROM SOM, 4 from soil mechanics, 6 from transportation, 5 from engineering drawing.
What is meaning of tlc
how to calculate the strength of rebound hammer test reading in building construction ?
manhole height is 1500 mm and width of brickwork is 230 mm dia of manhole covering is 560 mm brick masonry 1:4 horizontal length is 1500 mm and plaster 12 mm thick on both side 1:3. how to estimate the quantity of brickwork with mortar cement and sand for manhole chamber.
how can calculate cutting length of diamond ring
WET BULB TEMPERATURE AND DRY BULB TEMPERATURE?
Caching, Multithreading and RAMBUS are 3 methods for resolving the Bottleneck problem. Please give an explanation for each one (how are they resolve the problem?)
is there any codal provision for soil cousion over the Hume pipe of Dia 1.2 m.
How to calculate dry of volume of concrete constant?How it comes 1.54 or 1.57
I want to change job.If You have any vacancy please contact me in this mail id-parthamitra086@gmail.com.Myself partha mitra.Diploma in civil engineer with 4+ yrs. exp.Now in kolkata.If you confirm me then I will send my detail resume to you.Also send your mail id to me.My mail id is-parthamitra086@gmail.com.I will be very much thankful to you.
Under what circumstances should pot bearings be used instead of elastomeric bearings?
Define What happens to Load at yielding ?
Calculation of curtain wall of box culvert
why development length = 50D . why not 100D