As an engineer, what u should do when the construction of a
building doesn't meet the required specifications?
Answer Posted / rqn
if you are with the inspection team, the proper way is to
deduct the cost of the item involve based on the gravity of
damage, however, you have also to consider on the effect of
the item involve with respect to the time element in
completing the project and the structural stability.
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
How much cement,sand,bricks and water needed for 1square metre brick work?
How to plan a project
HOW MUCH STEEL REQUIRED FOR SLAB OF AREA 23'3"*18.3"? FOR SLAB HOW MUCH DIAMETER BAR WILL USE?
What is the cost difference between site mix and ready mix concrete per cubic meter
Why should you consider yourself fit to be hired by jindal steel.
How to calculate material and labor required for 100 m2 plaster?
Which are the top apps for you civil engineering?
What is the withdrawal force of steel nails?
How much quantity of cement,sand,stone used to build 1 cum of cc road??
What is .Dwg?
What is meaning of tlc
Will going from a 3-tap to 6-tap increase water pressure?
Explain what is progress payment?
qty. of cement & sand required (100sq.mtr) for fixing of floor and wall tiles also fixing of marble stone on the floor
Which are the top apps for you civil engineer?