Answer Posted / prabhat kartikey , me, iem, sg
Define, Measure ,analysis , The next step is Improving And
after contol.
Improving means some coorective action For Geting Desired
Result, or increase the productivity, Quality, Etc.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is the difference between automotive production and mass-production.?
What is quality management system? Weather qms is suitable, adequate and effective or not? Is there any quality policy? Is there any quality objective? If yes, then what are they? How they are planning to achieve quality objectives? Do they are measure quality objectives?
what is pl to pl in fire alarm system?
formula for convert liter in to pale
i have one air blow heater , coiled heater is in side hollow ceramic tube and passing the air and other end hot air is going out, to control the hot air where i should fix up a THERMOCOUPLE on the heater or on the out let of hot air terminal which is the best way
can we resonance with triple bonds?
Where do you see after 5 years
axial displacements of the turbine. What could be the causes?♪ ♪
what is machine tpm
How to Calibrate Mass Flow transmitter in field
reversing of each word in the string
I have 200kg weight cylinder,I want to rotate,but i don't know what is torque of cylinder and what's size of motor for rotate the cylinder.i want to know calculations find out torque of cylinder.
What is the major difference between Normal control loop and Cascade control loop and when to use cascade control loop?
if salary paid per month rs. 50000/- of male <65 i will deduct tds from his salary please what i will do explain?
What is fauit level