Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is the dimension of A4 sheet in mm?

Answer Posted / rokas

75CM 61 CM

Is This Answer Correct ?    2 Yes 13 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How is operate breaker failure scheme in substation

2119


How to Calculate KA Rating of Main LT Panel

1750


Define Electrical Insulation and examples of Solid,Liquid and Gaseous insulating materials?

1758


What are the causes of unbalanced current on 34.5kv feeder Ia=0.05,Ib= 0.25, Ic=0.15 and In=0.27 prior to tripping current are balance?

1742


why we r not earthed Control cable of C.T. terminals

2035


why capacitance effect is predominant in underground cable transmission and inductance effect is predominant in over head line transmission?

3673


A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.

1795


WE HAVE THE DC RECTIFIER 1500A, INPUT VOLTAGE IS 3 PHASE. HOW TO CALICULATE THE LOAD? 3 PHASE SIDE EITHER dC SIDE. PLEASE SUGGEST ME

1875


132/6.6πš”πšŸ πšπš›πšŠπš—πšœπšπš˜πš›πš–πšŽπš› πš—πšŽπšžπšπš›πšŠπš• πš‘πšŠπšœ πš˜πš—πšŽ πšŽπšŠπš›πšπš‘ πš™πš’πš πšπšŽπšπš’πšŒπšŠπšπšŽπš. 𝙸'𝚟𝚎 πšŠπš—πš˜πšπš‘πšŽπš› πšπš›πšŠπš—πšœπšπš˜πš›πš–πšŽπš› 𝚘𝚏 6.6πš”πšŸ/415𝚟 πšŒπšŠπš— 𝙸 πšŒπš˜πš—πš—πšŽπšŒπš πš—πšŽπšžπšπš›πšŠπš• 𝚝𝚘 πšœπšŠπš–πšŽ πšŽπšŠπš›πšπš‘ πš™πš’πš 𝚊𝚜 𝚘𝚏 13/6.πš”πšŸ πšπš›πšŠπš—πšœπšπš˜πš›πš–πšŽπš›?? π™Έπš π™½πš˜.. πšƒπš‘πšŽπš— πš πš‘πš’??

981


How grounding is different than earthings?

1165


what's the difference between abs/inc encoders. apart from the position remembrance what are all the other differences. and what's mean by grey code.

2088


As an electrical engineer what are the responsibilities which i can hold in TCS?

2208


1. How many types of mangers? 2.How many types of capacitors? 3.pls tell me normally types alternator problems?

2337


TO CALCULATE THE RESISTANCE OF GRR OF HT MOTOR 400KW WHEREAS STATOR VOLTAGE 6.6KV AND ROTOR VOLTAGE 705V AND ROTOR CURRENT IS 346A.

5499


what is consequences of neutral and earth connect?