my scenario is repetitive manufacturing (REM) make-to-stock
(MTS)production for sugar industry. What are the things, I
have to customize for this scenario, to the PP point of
view..
Answer Posted / manuel
This is a very large question, but I tried to resume it:
We supose you have the rest of Master data created (Work
Center, Bill of Material, Routing ) , so I will only
explain the differences;
1.- Material Master: You have to create Product Versions
(C221), add this information with MM02 to materials.
Also you have to Fill View MRP4.
2.- It's neccesary a Cost collector.
This a very
| Is This Answer Correct ? | 9 Yes | 4 No |
Post New Answer View All Answers
What is sla (service level agreements)?
What are all the steps involved in Variant Configuration?
What is standard order type
how many times pcc can run for one material?
How to attach a drawing for a material to bom ? Is it possible ?
What change management functions do you require? How do you want to define the validity of BOMs (based on date/freely definable parameters)? Must existing change histories be transferred to the R/3 System?
What is primary cost and secondary cost?
Difference between base unit of measure, production unit, order unit
What are the key fields in MRP views?
In cost controlling information system mention the fields that are listed in the list screen of the report?
What is the use of QM control key?
What is the use of plm (product lifecycle management) in sap pp?
What is the need of mrp list if the stock requirement list is already given?
What are the parameters are there in Order type or in dependent para. config?
Explain DMR.