my scenario is repetitive manufacturing (REM) make-to-stock
(MTS)production for sugar industry. What are the things, I
have to customize for this scenario, to the PP point of
view..
Answer Posted / manuel
This is a very large question, but I tried to resume it:
We supose you have the rest of Master data created (Work
Center, Bill of Material, Routing ) , so I will only
explain the differences;
1.- Material Master: You have to create Product Versions
(C221), add this information with MM02 to materials.
Also you have to Fill View MRP4.
2.- It's neccesary a Cost collector.
This a very
Is This Answer Correct ? | 9 Yes | 4 No |
Post New Answer View All Answers
Explain the process of Material costing.
Are there any reports in sap to list of material requirement from ltp ?
What are traffic lights in mrp?
How costing is affected the pp?
What is standard order type
Define gaps.
You want to integrate pp with fico. What steps would you take?
Explain how can you create production order without routing and bom?
What are the MRP master data?
Explain the uses of the simple maintenance interface?
What are the types of MIC?
Can't one material be assigned to more than one operation in a routing?
How is indian slab and us slab?
In the monthly lot size proc, how to generate lot at the end of Period?
Mention how mrp (material requirement planning) types are classified?