What is the purpose of starter and choke in tube light?
Answer Posted / rajendra singh
The purose of starter and choke in tube light circuite,for
start-up the tube lights.
The choke work as a blastand induced 850V to 1100V in
starting,by strarter make and break of the circuite. After
glowing the tube light choke work as inductance and provide
110v to circuite.
| Is This Answer Correct ? | 204 Yes | 56 No |
Post New Answer View All Answers
What is milivolt dop test in Busducts? What is its significance & procedure to do the test?
what is the mechanism of operation of brushless dc motor why is it more wexpensive then ordinary permanent magnet motors
TYPE'S OF BREKAR ,WHAT IS TRANSFORMAR & SAFTY. STARTER DOL & STAR DELTA STARTER.
do anyone out there know where to find a compleete list on acronyms/abbreviations used in offshore electric engineering. MCB - Micro Circuit Breaker, MCCB-Mouldes Case Circuit Breaker, ELCB-Earth Lekage Circuit Breaker, ELMCB- etc.....
If an electrical component has a positive temperature coefficient, how come such components have high power losses due to heat if current decreases when resistance increases? assuming power given by I^2*R whereby the Resistance is infinite.
sir, i am 3 years diploma course pass out candidate.what type of certificate can i got in marine service.
Is there any Electrical supervisor license which gives permit to work whole India rather than individual state??
why in an industry; machine having rated 200 h.p stopped after power factor is maintained above 0.97 lag by control panel in view-of energy saving
The 3 phase 400 hp 440 volt slip ring induction motor do not take one phase amps why ? The motor is running good condition
What is the normal phase difference between the voltage and the no-load current in a transformer?
i installed 100kva ups. what KVA genset they should provid in input side? plz any update formula or ans with reason.
why the active power flow of some line is increased when the active power of out is cut ?
What is meant by system?
what are the range of memory address in plc for L&T lx7 4A
How to Prepare preventive maintenance shedule of machine tool.