Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How to defind P.C.C. mix design according ratio & IS coad

Answer Posted / kiran babu t

For pcc there will be no any mix design, because it is low
grade of concrete,generally it will use for levelling the
surface,i.e below the footing and so on,
Design mix will be according to weight
Nominal mix will be according to volume

Is This Answer Correct ?    58 Yes 14 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.

13408


How will be cutting in timber plate size 600*400 column size

1811


How to make a c++ program that converts any base to base 10?

2071


the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm

2359


Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks

1992


Describe the various methods of concrete curing?

1152


Explain how you can use different dimension tools in CAD? What are the different dimensions available?

1100


A roof has a U value = 0.65 W/m2 .C. Extra insulation is to be provided. This insulation has a thermal resistance = 1.5 m2"C/W. Calculate the new improved U value.

2266


(Project Management Topic) What are the important criteria in the successful realization of the project?

2169


What is meant by a context menu in a cad software?

1107


sir please send me campus placement questions in civil engineering

3591


how do we design mix ratio?

1858


I want to know how much the lapping length for the pilecap reinforcement.. we r using single pile cap which is 24mby54m and 2.5m depth.. total 91piles are supporting the pile cap.. how to do a steel reinforcement??

2356


what is Bearing Capacity,How to determine it?

1284


whaat is blister in box girder bridge and what is its function..

4936