Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Please tell me about
hydraulic machine.

Answer Posted / karthick

hydraulic machines use hydraulic energy and convert that
into relevant mechanical energy such as turbines

Is This Answer Correct ?    26 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is difference between ASME EN & IS related welding procedures(WPS/PQR/WPQ)

3929


can any one send me all the interview questions and test questions on strength of materials . to devarajk23@yahoo.com

2132


Dear all, Will some one help me in this issue please? We are entering the Zero Stock Component in Maintenance Order, and we make a Check when the order creator is going to release system will appear Error, until he will not delete that zero stock components from the Maintenance order. but right now what the order creator is not releasing the order but he is going to save order, when's he save the order without release system will generate Reservation in the back ground, which should not happen for Zero Stock Components ? I need the way which we are doing in MB21, Reservation creation by thru Cost Center / WBS Element. At present if you run MB21 and you are going to issue the material system will not allow to generate the reservation if there are zero stock components in the list. please guide me for this issue ? Note : Simple what I need is I don't want to create any reservation thru maintenance order for the Zero Stock Components. Regards, Abdul Mujeeb

1810


Define the terms free energy and free enthalpy. What is their significance and importance ?

1338


draw IRON-CARBON diagram.

3929


We have fifteen year old CNC turning lathe,placed in dust proof room,recently giving control problems frequently.We are considering to retrofit it.Pl.brief me about various point I should consider for accessing the mechanical health of machine.

1811


explain the mixture requirement of si engine to meet the demands of various operating condition?

2584


Question regarding property of Critical Path?

2065


low of heat transfer

4800


What are the some examples of a periscope?

1019


please briefly explain the Discharge process and Formula of Centrifugal Pump

1932


What is jet plane?

1139


What is a bearing?

1130


what is the basic need for designing the bottle filling machines

2294


What is meant by free or natural convection?

1056