Answer Posted / lakshmi
In the process of Test Execution when a discrepancy is
found between the Actual and the Expected Result the Test
Engineers raise a bug.
The initial status of the bug is NEW
When the raised bug is assigned to the DEVT lead then the
status changes to OPEN
When the DEVT Lead assigns the Bug to the developers the
Status changes to ASSIGN
When the developers feel that it is not a bug the status
changes to REJECT and if the raised bug is duplicated
DUPLICATE and when he fix the bug it is FIXED
When the fixed bug is assigned to the Test Engineers it
will be in RETEST status
When the bug has been resolved it will be in CLOSED Status
When the raised bug exists after retest it will be in
RERAISE status.
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Can you explain an application boundary?
What are quality assurance and quality control?
how can you test the web environment for security testing?
There is only requirements document. You have 10 days and 8 resources to release the system.At the end of the 8th day u tell ur TL that system is ready for release. How will you proceed with the testing process or in other words what all approach you will follow once you get requirements
How do you go about testing a project?
qtp9.2 and qtp10.0 difference
What is 'Account Conditioning'?
what is acid testing?
What is Batch testing? Facets Benefit Configuration
WHAT IS PROTOCAL TESTING..EXPLAIN? L2, L3 PROTOCALS TESTING MEANS WHAT?EXPLAIN BRIEFLY
Functional and Integration test scenarios for actitime application
What are the differences between stlc and sdlc?
What ishigh severity, low priority bug?
If client give you a project then which testing you will perform first
what is the relation between all tabs in quality center & explain the testing process in quality center with tabs?