Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is the difference between cable routing and scheduling?

Answer Posted / victorvgp

In general cable routing doc. shows inf. about how cables
are routed in cable trays, trenches and duct banks.

Whereas, cable schedule shows inf. about the specification
of cables along with the inf. listed at the end.

cable routing - cable routing cross section layout (or)
cable routing layout

In cable routing cross section layout, cross section of a
particular [DBE(Electrical Duct Bank)/CTE(Electrical Cable
Trench)] is showned, which shows the actual dimensions of
DBE/CTE and how the cables are arranged as per the type
(LV/MV), requirement and sequence.

Cable shedule is of two types one is Internal Cable
Schedule and External Cable Schedule.

INTERNAL:
In this doc. inf. of cables run inside the
substations such as Transformer to Busbar, Busbar to Switch
board like that.,

EXTERNAL:
In this doc. inf. of cables run outside the
substation such as from Switch board to LDB, Switch board
to Equipment/LCS like that.,

The following inf. are available in cable schedule:
1. Cable id no.
2. From which equipment/SB
3. To which equipment/SB
4. Substation No.
5. Unit no.
6. Cable type(cu/xlpe/swa)
7. Cable voltage[.6/1]or[3.6/6(7.2)]
8. Remarks(inf. about work nature of cable) etc.,

Is This Answer Correct ?    34 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Why neutral is not used in three phases dol starter

1882


we have a lot of model of rectifier but thyristor rectifier is the most rectifier that use in power system. Do you know why this rectifier is used?

1729


What is tan delta & PPM in transformer? and whats its IS value?

2082


In CTs tan delta point should be earthed , what is the reason behind it?

2967


What is the ideal position cooling fan inside the dc motor?

2040


What is the most accurate way of testing ELCB?ELCB is better than RCD?

3282


How can I calculate per unit (KWH) fuel (Gas/ Diesel both) consumption 1MW unit?

2062


what are the parameters plays a major role in Potential transformer Burden calculation??

2121


How to address the servo drive for motor

1955


CAN CU XLPE/PVC CABLE BE USED INPLACE OF LOW NOISE SCREENED CABLE? KINDLY GIVE REASONS

1816


What are the symptoms of a bad PG card of a drive (inverter) esp. of Yaskawa Ac Drives (inverters) G7 ?

1992


If there are two transformer having rating of 2.5mva, 6.6kv/440v(satr-star),and the load is 600kw then what is better to maintain less losses in transformer having both transformer in parellel or only single transformer connected to load? Please give calculated answer

2662


What is the formula for selecting the cabels according to load? How to calculate what sq.mm cabel to be used?

1434


Explain what is clipper and clamper circuits?

1123


We have drive feeding an output contactor for a 5000 hp motor @ 5kV application. The motor FLA is 629amps x 1.25% service factor = 786.25 amps The cable that we current have in place between the drive and the output contactor is 350kcmil- MV-105 (parallel cables). Per the NEC table 310.60 (C) (69). This show the cable ampacity is at 615 amps per cable for a rating of 1230 amps. We have derated the cable for the cable tray and the multiple cables application and our calculations show that after the correction factor factor we are at 922amps. 1230 amps x .75% correction factor factor = 922.5 amps. The customer is driving us to then use another safety factor of .25% off of the already derated cable. Can you please provide a longhand calculation for your solution on this application?

2095