What is refurbishment order ? Explain the total cycle ?
Answer Posted / govind kiran kumar reddy
A refurbished order is made against a M4 notification,
Refurbishment notification. A refurbishment order is made
using transaction IW81 with a settlement order generally a
maintenance order like PM03 . A refurbishment order plans
and make a purchase requistion for external services for
repair of the defective piece recieved through a M4
notification.A refurbishment order is used to repair
repairables and rotables with a valid serial
no.Refurbishment order is advantangeous to track the
history of rotables and warranty claims.
Is This Answer Correct ? | 4 Yes | 23 No |
Post New Answer View All Answers
Which price of material is fetched while calculating material price in planned and actual cost in maintenance order?
What is sap pm ?
Which goods movement is used to issue material with reference to a reservation triggered from a maintenance order?
What is the maintenance plan? Different type of maintenance plans?
A reservation is triggered from a maintenance order and user is trying to issue material from warehouse with reference to the reservation. But system is not allowing goods issue? What I need to check?
How would you define equipment/material loaned to a customer?
What is refurbishment process?
What is settlement profile?
What is t code to create a catalog code and code group?
How will you make a field mandatory in maintenance notification for a certain notification type?
Which maintenance plan is suitable for managing outline service agreement and what call objects are required?
Is it possible to enter measurement document for a measuring point without any numeric value? Such as yes/ no or ok/ not ok. How?
You tried to install an equipment on a functional location but system gives you an error. What could be the possible reason?
How can a user differentiate simply between an equipment which has been charged and not charged for a service?
Can a service order be generated automatically without running ip30 if we have scheduled a maintenance plan?