Answer Posted / prince ali
Engineering is basically attempt to understand the mechanism
which mother nature has endowed to various happenings,
knowing which one can bring in his creativity and try to
modify the mechanism and bring in a better life for
everyone. Eventually engineering is an ateempt to reveal
various secrets of nature and then modify them in accordance
to our needs.
| Is This Answer Correct ? | 1 Yes | 2 No |
Post New Answer View All Answers
What is the purpose of biological shield in nuclear plants ?
What is acceleration
Name the operation which can be performed by lathe machine?
Which reactor uses natural uranium as fuel ?
What are the typical indicator diagrams?
What does 0.125 inch stand for in 0.125 inch npt thread?
Identify the parts of steam turbine
What does a rolling offset look like?
Which element is added in steel to increase resistance to corrosion ?
Is the unit and normal value fuel ratio of an average diesel engine?
pls tell me the process to set up a power plant right from the permission from state govt ????
Give the safety precaution when working in a high place.
give me an example of time when u something u tried to accomplish and failed.
What is defrence between relaction & refraction?
Dear all, Will some one help me in this issue please? We are entering the Zero Stock Component in Maintenance Order, and we make a Check when the order creator is going to release system will appear Error, until he will not delete that zero stock components from the Maintenance order. but right now what the order creator is not releasing the order but he is going to save order, when's he save the order without release system will generate Reservation in the back ground, which should not happen for Zero Stock Components ? I need the way which we are doing in MB21, Reservation creation by thru Cost Center / WBS Element. At present if you run MB21 and you are going to issue the material system will not allow to generate the reservation if there are zero stock components in the list. please guide me for this issue ? Note : Simple what I need is I don't want to create any reservation thru maintenance order for the Zero Stock Components. Regards, Abdul Mujeeb