Answer Posted / manickam
DEMAND MANAGEMENT-MPS(PLANNED ORDERS)-LT CAPACITY EVALUATION
(FIRMED PLANNED ORDERS)-DETAILED SCHEDULING(PRODUCTION
ORDER)-MRP(REQUIREMENTS)-
1.PRODUCTION ORDER RELESE-PRODUCTION ORDER CONFORMATION-WIP
DETERMINATION-G.R/G.I-RECORDING-SETTLEMENT-
ARCIVING&DELETIONS-MASS PROCESSING.
2.PURCHASE REQUISTIONS-PURCHASE ORDER-GR
Is This Answer Correct ? | 3 Yes | 7 No |
Post New Answer View All Answers
Can we have more than 6 standard values in standard value key?
What are the t-codes for creating, changing and summarizing bom?
What is the Difference between TECO and CLSD?
I have having 14 years manufacturing experence & 6 years in SAP-PP/QM.Was a core member during implementation.Now I want to work as Functional Consultant in SAP-PP/QM.What should I do for getting the jobs.
What is the purpose of using capacity planning?
Can't one material be assigned to more than one operation in a routing?
We need to do gi of components to production order using back-flush. The component stock is managed in batches. The batch to be back-flushed?
What is sap pp?
What is mrp controller means?
How can you get planned orders scheduled so that you can do capacity leveling ?
We have two storage locations are ‘0001’ and ‘0600’. Default storage location in process order is always ‘0001’ what determines this default location?
Explain source inspection.
What is the difference between stock transport order and stock transfer order?
What is processing class, where we do them and why?
In cost controlling information system mention the fields that are listed in the list screen of the report?