Answer Posted / ramprasad
Testing can be started when the build is ready with the new
implementation / enhancements code and it is testable.
| Is This Answer Correct ? | 7 Yes | 5 No |
Post New Answer View All Answers
How are the quality assurance activities planned ?
Hi I m working as a sqa engineer and after 1 yr i want to switch to system analyst side kindly tell me how both fields relate each other and is this easy to switch job from qa to system analyst and what's the difference b/w both fields.
What are the common problems with software automation?
What should your qa documents include?
What is mr and what information does mr consists of?
What are the different levels in software testing?
What kind of things that forbidden to do by a SQA Tester if He/ She don’t want to get fired?
hello.. i have learnt testing manual and automation tools and im working as test engineer in a software company still i do need more testing skill so where can i get more knowledge about testing . please advice me
What Winrunner framework did u use in ur organisation?
What if the application has functionality that was not in the requirements?
how do u start web logic in your application
What is the strategy for automation test plan?
Explain what are test driver and test stub and why it is required?
What is the difference between the test plan and test strategy
What is mr and er?