could you tel me the kind of questions general asked by
technical round about ERP.
Answer Posted / anil kamat
ERP is a vast field and type of questions depend on which
field you will be into and which industry you are joining
to viz manufacturing sector, service sector etc.
Questions given by murali are generalised. But nobody calls
you for an ERP interview without you knowing what an ERP is
and what do you mean by it.
They just try to check what depth and what field you are
knowledgeable.
supposely i ask you what is forward scheduling and backward
scheduling in SCM then it indicates that i am opting you
for operations field .
So be clear on your field of work and then you can be sure
of answers.
Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
my jindal interview is on 24th.. can anyone give me few tips regarding the same? lik how i shud prep
Hindustan petroleum placement papers.please send me.
why the head portion of the screw jack (which carries the load when not rotating) is made hollow?
What is meant by direct heat exchanger [or] open heat exchanger?
i am from karnataka can i able to apply appsc
Can anyone explain Things gone right(TGR) and Things gone wrong(TGW) in the APQP process? preferable With example.
How many 1.5 ton A/Cs can run on 7.5 kw generator (diesel)?
Dear all, Will some one help me in this issue please? We are entering the Zero Stock Component in Maintenance Order, and we make a Check when the order creator is going to release system will appear Error, until he will not delete that zero stock components from the Maintenance order. but right now what the order creator is not releasing the order but he is going to save order, when's he save the order without release system will generate Reservation in the back ground, which should not happen for Zero Stock Components ? I need the way which we are doing in MB21, Reservation creation by thru Cost Center / WBS Element. At present if you run MB21 and you are going to issue the material system will not allow to generate the reservation if there are zero stock components in the list. please guide me for this issue ? Note : Simple what I need is I don't want to create any reservation thru maintenance order for the Zero Stock Components. Regards, Abdul Mujeeb
What is the effect of high alkaline water to a boiler?
What is the purpose of bilge separator
What are the 1st 2nd and 3rd laws of thermodynamics?
QUSETION PAPERS SOLVED FOR THE LAST 4YEARS RRB EXAMS
Which pump is more efficient centrifugal pump or reciprocating pump?
Why you consider yourself suitable for the post
What is the purpose of air blow?