In how many places we can block the Sales Document?
Answer Posted / sunil k
1) AT header level, using the Delivery Block field.
2) At item level, using Reason for Rejection field.
| Is This Answer Correct ? | 8 Yes | 1 No |
Post New Answer View All Answers
Can you assign two different sales organization to the same company code?
What is the relation between credit control area and company codes and explain the credit control area?
Can anyone walk me through the process of what happened when you do the post good issue in delivery? Moment type 601, let’s take that as an example, what happened in SAP? Suppose 601-moment type is posted in SAP, what happened when you do PGI (Post Goods Issue) as any account happens and if yes then what kind of account posting happens. please tell me, after PGI is completed what happens?
What are the different contract types? How to create a contract in sap system?
Copying is not possible. because an entry is missing in Table TVCPL: TA TAN Message No. VL473
What is sales order item category determination and what is delivery item category determine?
What is a 'customer-material information record'?
Which partner function realent for credit limit?
What are the sap erp release, enhancement pack and support pack requirements for integrating with sap tm? : transportation management
What is partial delivery agreement?
If you generate bill more than credit limit then what will happen?
What is the difference between sd account key and fi account key?
What is erp and sap?and why inplementing sap in an organization? Explain the special features of sap over other
What is product attributes in sap sd?
What’s forward scheduling and backward scheduling activator? There’s a concept called forward scheduling and backward scheduling logic when you do an availability check whenever your order is created system will check whether it’s forward scheduling or backward scheduling, if it’s fatal we have a concept of how is it working, how is that you created as part of your available promise concept? Whatever that date is being considered as part of the logic, whatever the date that is configured or we maintain the data to say know that system tell to create this output back scheduling