Based on CPI/CGPA they shortlist the candidates & than
directly start Interview so there is no Written Exam or GD
Only PI.Interview held @ MNNIT , ALLAHABAD On-Campus on
6th,Aug, 2007 & the Questions asked to me by Interview Board
( 4 People) are from HR/SummerTraining/BTP/Subject-core,
POWER SYSTEM & MACHINE. time duration of I/V is about 15-20
Minutes.
HR-
Q.1 Name,hobbies & About family background ?
Q2.What u know abt NTPC ??
Q3.Why u want to choose NTPC as ur Carrier's starting i.e
power sector not any other Oragnisation or sector ??
Techincal Questions-
Q1.What is the reason for transformer Noise ??
Q2.Which material is used for making Transformer oil & How u
measure its dielectric strength & Name the test ?
Q.3 Which Machine u will prefer 2 use if flammble gases are
coming out at a place & why ??
Q4.What is relation b/w Transmission Lines & Communication
Lines ?
Q5.What is the maximum capacity Synchronus Machine & total
powerGeneration in our country ?
Q.6 In india Power generation is at 50Hz while in America
its 60 hz ,why so ?? Advantage or disadvantage ??
Q.7 Maximum Generation Voltage in india ?
Q8. What is the Voltage regulation & why its required n how
much is permissible ? & causes of voltage variation ??
Q.9 Why electric shock is feel ?? n in a Electric Train why
we didnt feel that ?
Q.10 Have u seen/ experience of any power plant/ industry
related to the power sector ?
so these are the questions which not too diffcult i
think was asked to me.
Post New Answer View All Answers
i have a 1500kVA transformer what is the kWH meter i need to use?
exolain the star delta connection
Is there any relevant technique to produce power from light and heat energy of the sun simultaneosly from same rays of light?
i am completed in B.E(Electrical and Electronics Engineering) with 8 months experience in Quality Control Engineer at Bharathi Industries,Coimbatore.
Inverter. converter. Ups.MCB.solar.alternators. motors.
WHAT SHOULD BE THE BEST CURRENT RATINGS (PRIMARY / SECONDARY)FOR A CT INSTALLED AT THE INCOMING 11KV PANE? WILL IT BE CALCULATED ON THE BASES OF MAXIMUM DEMANT VALUE OR ON SUM OF ALL TRANSFORMER'S KVA? NOMALLY MAX DEMAND REPRESENT THE MAXIMUM OPERATING LOAD OF THE PLANT AND TOTAL KVA OF (SAY 5 NUMBERS TRANSFORMERS) REPRESENT THE CONNECTED LOAD. WHICH i.e. MAX DEMAND KVA OR CONNECTED KVA ARE BETTER TO USE FOR CT CURRENT CALCULATION? PLEASE ANSWER.
How to select transmission line type (i.e. 11kv or 33kv) for new established industries
Dear all i am kumaravel. now in chennai. my work is control and relay panel auto cad designing.up to 11kv to 400kv then question is i am improving my knowledge. i want some books name and auther are available for this C&R panel related. plese any one help me
What is Primary And Secondary Injection Test of Relay and Other Electrical Devices. How IT is carried out.
If any one's require of phoenix contact like( relay , termilnal block , surge protection device ) , product please contect me 09878206357 chetan verma
why the earth is taken minimum in supplying? wather it the proportional factor to getting work any equipment or a power plant?
Does outdoor isolator loose connection cause short circuit current in that circuit? if yes then how ??
All tape of electrical questions Answers tape of motor transformer e.o.t crane
How many energy meters can be connected on a 15VA Voltage transformer. please send a calculation sheet.
Why air circuit breaker off due to power failure?