Answer Posted / uday tank
Types of cement
Moisture contain of sand
Impurity of water, sand, aggregate,
Curing of concrete wore
Indicial and final setting time of cement
Quality control of work
| Is This Answer Correct ? | 15 Yes | 3 No |
Post New Answer View All Answers
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
Critical Path Method is...
. Write a C program to perform following functions:- a. Declare one integer variable of all the storage classes. b. Print all the variables without assigning any values in tabular format. a. The tabular format must contain the variable name, type, storage class and printed value on the screen in RED color.
Define Workability ?
howto calculate the quantities of material used in fly ash brick after finding the volume??
Explain major differences between routing maintenance and major maintenance.
What is the significance of cost estimate knowledge for an architect?
What is a kip?
To pcc 11 ft x 24 ft .How many bags of cement, sand and aggregate required? And for roofing how many cgi sheets required?
What is Joule Brayton Cycle?
Used Cement & Sand in 1 Square Meter or 1 Square Feet For Brick Work 0.115mm ? (1:4) (1:6)
Formula of mid span bar
how many monpower required for 1 sqm normal RCC structure ( includes finishes & MEP )
What is the compressive strength of fly ash bricks?
IS code for Rolling Margin of steel