Answer Posted / abhishek d. rathod
Civil Engineering is a process not destination.
It is an art to give shepe to future & impossibilities &
by that letting others to wonder.
| Is This Answer Correct ? | 6 Yes | 3 No |
Post New Answer View All Answers
If a slab concrete is placed with M-20 grade concrete, actually it has to be placed with M-30. what are the rectifications / measures to be taken after concreting is done.
what is modular brick and it size
1.Why we are preferring 43 grade cement than 53 grade cement. 2. Approximate cost difference between 43 and 53 grade cement. Thanks.
Doul Bar reinforcement and details of drawing.
60-70 grade of Bitumen is VG-30 ?
give me the mix proportion for design mix concrete M 7.5 grade 1:4:8
IN Compression testing machine 1division =10KN ,then what is compressive strength of 100*100 mm cubes at a load of 320 KN
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
what is the name of shuttering oil used in oman
How many axes do cartesian coordinate system has?
what energized you to complete your course?
The mixture of different ingredients of cement is burnt at?
what is the difference between tsp & tower
At one time what is the height of Lift for concreting for Bridge Piers Class B Loading and refer the code.
How to do bbs in excel format