WHAT IS THE DIFFERENCE BETWEEN PLC AND DCS
Answer Posted / shan
The difference between DCS and PLC is that, PLC is
primarily a small scale control system which only executes
only digital function. When we say DCS, It is a networks of
PLC's,it is a large scale control system which is
distributed all over the plant,and is located in a control
room.
| Is This Answer Correct ? | 60 Yes | 62 No |
Post New Answer View All Answers
What are the type of bonnets in the control valves?
why Fahrenheit unit of moistur analyzer transmitter
A valve in series with an orifice plate (DP transmitter), is aligned for constant pressure in the pipeline, if there is an error dx, How to align it in process.
Explain the working principle of lvdt?
Im having problems with interfase betwen SPI v7.0 and SPPID v5.05. Previous versions of Intools shoul be fixed with SPPIDproj.ocx file. It was necessary to replace this file with one that allows the connection between different versions of SPPID. It is necessary in the current version to do the same?Thanks
What is the diffrence between digital signal processing and discrete signal processing?
what is maxdna ?. explain about the software details.
why we use the ac supply load cell>?can we use the dc supply load cell?advantages and disadvantage of the ac supply load cell?
what is the difference between scaler and vector drive
Linear amplifier.
What is limitation of the ht.of the displacer of a level trol?
How will you test a transistor with a multimeter?
I am teja. I am studying Msc(tech) Electronics and Instrumentation (3years course) in Andhra university. But my course is not recognised by UGC and AICTE. Please tell me the job opportunities after this course. And i fineshed PLC course in IGIAT ,Vizag.Also complted my short term coure in SCADA, Seimans WinCC in ATI,Hyd.After Msc can i join Mtech for good job? or phd. How i can get good job in INdustrial Automation Side. Please give replay.Because this is my life matter.
why we use cascade control and feed foreword control in 3 element control of boiler drum ?what is feed forward and cascade control system ?
what is The specifications for oriface instalation