Answer Posted / rohit
I being a QA/Qc enggr,positively feel that ne wreports to
be introduced as diversion/rejection reports,non
conformance reports, design quality indicators, Graph
representing overall Pour cards info. showing the desired
quality maintained in each member.QA/Qc -materials & works
to be divided in 2 segments.
Rather,Quality needs more attention(Limelight!).
Any body having any quality related info, please share.
Is This Answer Correct ? | 1 Yes | 4 No |
Post New Answer View All Answers
What is the withdrawal force of steel nails?
How to calculate Cement in bags ,sand in sqft and aggregate in sqft for 1cum M25 grade concrete
5. Do you feel that your present employer estimates your full work potential? Are they pleased with your work performance?
Which stone is best for wall construction Laterite Stone or Cement Blocks
what is the minimum compressive strength of clay brick
Soil bearing capacity formula
when it is noted "JAMB SIM" what is the term "SIM" and what does it mean?
1.Why we are preferring 43 grade cement than 53 grade cement. 2. Approximate cost difference between 43 and 53 grade cement. Thanks.
how many spacers we need for 1 ton reinforcement? aprox.
What is the method of soil replacement test?
Define graphics window?
How to do base isolation for RC framed structure using ETABS software?
rate analysis for cement pointing 1:4 , for 100 sq m
Define What is an ice dam sock?
What is meant by cartesian coordinate system?