Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

if current required for triggering thyristor at -30
degrees(temp) is 80 mA, what is the current required at 60
degrees

Answer Posted / graeme

80mA seems to be a lot of gate trigger current.

Firstly, this information should be published in a
manufacturer's data sheet.

Secondly, generally the gate trigger current required at
elevated temperatures is less. So if you used 80ma as a
value at +60 degrees C, you'd be safe

Is This Answer Correct ?    0 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what shoud be strength and weakness to impress interviewer????????

2022


what is a pulse transformer? how rise time of pulse changes when ever the voltage changes?

1897


what is feed back and what are feed back amplifiers?

1023


what is lumped and distributed elements?

1897


what are the installation procedure of high voltage power transformer,CT,CB&PT?

2003


234 MVA Generator 3 phase Short circuit current Values required? Gen set Rating-234 MVA, Gen Voltage-18kv, PF;0.8, Xdv:23.5 %, Transformer Rating-18/380KV, 680MVA,Yndd1 two winding, Step up TR, ZT:35.50 %,X/R 4.33 Gen CB Position, CB open ,Disconnected open, Generator Running Voltage 18 Kv, Bi mistakes generator side earth switch Closed during that time short circuit current level in 3 Phase required, and how to test on site 234MVA Generator Short circuit current,

2170


Practical condition in 400KV Sub station:- Breaker(open) , isolator(open), Earthing (close) at both end e.g A & B. Now Open A Stn Earthing than Open B stn Earthing (Which have a 50MVA reactor) , AND suddenly show R,Y,B phase 704KV,573KV,118KV respectively. Que is without closing of breaker how it is possible.???? My Whats app No:07621840498 for Further Discussion. Pls experts suggest.

2027


What happen if 200 KVAR capacitor connected to power continuesly?

2073


what is the diference between the 4pole & 6pole DC Motors & what is advantage 6pole over the 4pole ?

1956


explain the types of drives

1919


What is a compensator?

1017


If Polarization index of motor 8.75 at 500volts of medium voltage 4.16 KV motor what this mean winding good or bad pl answer if any reffrence book give me the link

2075


What is mathematical model of a control system?

1083


for 4 MVA , 33K.V/6.6K.V transformer. secondary side the connected load is 3000H.P. What is the rating of capacitor bank to be insttaled.

2526


what is the difference between switch yard to residential area.and how much required it.

1700