what will be the weigth of 50 kg/sq cm and 30 kg/sq cm
compressive strength solid concrete block of 200 mm ?
Answer Posted / vijendra singh
50 kg/sq cm,
30 kg/sq cm
| Is This Answer Correct ? | 2 Yes | 11 No |
Post New Answer View All Answers
What is Density of cement, sand & aggregate ?
How we can calculate the cement, sand,bricks , water , quintity in 1:6 Ratio 1 cubic metre b/w and 1:4 Ratio in 1 Squre metre b/w????
if we know load bearing capacity of the soil and building load falling in each footing, then how to choose the type of foundation??? and if it is shallow foundation then which type of shallow foundation should be choosen i.e either strip or isolated or raft or combined or cantilever footing???????
Slump Values for works?
Can rice husk ash be used instead of coal fly ash for manufacture of clc/ foam concrete
what is the construction cost for per cft of multistorryed building in kolkata?
1. For 10sq.m area(47 kg bitumen contain) of 45 mm thick bitumen mix layer..how much bitumen is required for 1600 sq.m and how much aggregate need for that ?? 2. And much tonnage of bitumen mix required for 10 sq.m area of 45 mm thick. Please give answer...
does a b.tech civil engineer fresher supposed to know how to design rcc structure?
i have boiler of 35 tone and wanted dig out foundation is there any body to help me to carry out calculation for the foundation like
What is the nature of duties & responsibilites senior civil engineer ?what is self confident & satisfaction should be a senior civil engineer?
I Want To Know Quantity of Cement Conc. & Sand in Column of 9"x9"x10'
TO CONSTRUCT A 1800 SQFT CAPACITY UNDERGROUND WATER TANK HOW MUCH CUFT CONCRETE IS REQUIRED AND HOW MUCH REINFORCEMENT IS REQUIRED. FOR COSTING
In cement making,what is meaning of blend,fineness,density.
02. a. The diagonal of a 9 cube…………… 1 b. Surface area of 9 cube…………… 1 c. Volume of 1-3 cube …………… 1 d. Compressive area of 6 cube …………… 1 e. Top & Bottom face of a Cylinder/Cube is to be proper leveled to deliver the…………………………..…… properly.
How to calculate the cement consumption in RR Masonry in CM 1:8 for the foundation of Ground Level Reservoir