Answer Posted / vijendra singh
civil engineering
it is a line of construction in which we consider all tye
of possiblities, like earth quake, wind load, dead load,
requirement form the client
| Is This Answer Correct ? | 5 Yes | 5 No |
Post New Answer View All Answers
How to determine spacing of bars in slabs or beams
how to shuttering is used in slab
What is the difference between Rock And Murrum. How to claim that excavated material is not a murrum but rock.
procedure for preliminary selection of size of column of 5 storey building
What is the standard unit weight of Cast Iron pipe of 200MM Dia.(pipe specification is IS1538)
If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?
Does VDF add strength to the flooring apart from preventing water ingress?
HOw much % of premium on DSR-2013 currently
Aptitude, reasoning, quants, verbal and technical question
Is there the dry coefficient of cement is constant?
Define What is the tensile strength of wood?
How many pyramid in egypt?
What is difference between code and standard and specification?
what is the productivity in aluminium shuttering per day
How to design 12*12*14 room having rrc slab ,coloum, beam,foundation?