Answer Posted / vijendra singh
civil engineering
it is a line of construction in which we consider all tye
of possiblities, like earth quake, wind load, dead load,
requirement form the client
Is This Answer Correct ? | 5 Yes | 5 No |
Post New Answer View All Answers
How to find weight of steel in kg if we know the area which is in m2? Following details are known to us, Area=125m² thk of slab=250mm Steel details:T12@200 PS:considering mesh top and bottom with X and Y direction
What do you meant by gui?
how to estimate material requirement for an area of house in square feet?
how to calculate the crushing strength of cement concrete paver blocks 100x100x60 mm thich.
What is the standard unit weight of Cast Iron pipe of 200MM Dia.(pipe specification is IS1538)
Which code specifies the specification ofthe construction joints to be provided in the raft slab of a basement which is 6 m deep.what should bethe detail of such a joint?
How to calculate or what is the process of calculation for making 1Metre squre area by AAC Blok which quantity of Cement, Sand & Chips are to be required?
In which code the the maximum height of concrete casting has been explained
How can you distinguish between sorption, absorption and adsorption?
For removal of formwork of simply supported slab / beam from where to start the deshuttering? ( Max Bending moment of the simply supported beam is in the center hence is it required to start from the supports?)
for a column of size 400*230mm column reinforcement= 8-20x(cant write the symbol,i hope u guys undersstand,something like (fi) column stirups=8x@(4l) 230c/c 1)what does these mean 2)how to calculate quantity of steel for this column(ceiling height 11 ft)
How much does the leaning tower of pisa lean?
what is the steel difference between np-2 and np-3 pipes and weight also
For the construction project what capital cost has to be taken in consideration?
what is the service corridor?