what is the diffirence between deviation and change control?
at what situations we can raise the deviation and change
control
Answer Posted / rambabu komati
deviations are two types one is planned deviation and
another is un planned deviation. Planned deviations are two
types one is tempery and another is permenent. tempery
deviations are approved by QA then u proceed. permenent
deviations are must be reviewed by releated departments and
approved by QA through change control procedure.
Regards,
Rambabu
Is This Answer Correct ? | 347 Yes | 67 No |
Post New Answer View All Answers
Give an example of how you've handled a problem patient.
What was your most difficult experience with this population and how did you deal with it?
how many clauses are there in iso? give me the clauses details?
Tell us about your oncology experience.
What are the regulatory commitments in markets like USA, Canada, Europe, Brazil, South Africa and Japan
what is the mechanism of action of local anaesthetics?
Caffeine standard is recommended by the monograph for HPLC wavelength accuracy calibration. It is covered range of 205 to 273 only.If the method have wavelength beyond the range, then how it supports for instrument performance?
Tell us about a time when you failed to meet a deadline. What were the repercussions?
what is ur strengths and weekness in ur professional life as medical rep?
Hi Sir?Mam, If i complete SAS CLINICAL in India, can i step forward to USA for job trials? How far is it possible? Am a B.pharm student ,willing to make up my Master's degree too,will this both M.Pharm and SAS help me out to get a job in USA? Please help me out with a good answer.
How should the Medical Librarian interact with training staff?
If calibration of 12 bowl dissolution apparatus does not meets single stage procedure, how can u proceed calibration?
How to do IR test of hydroscopic materials
Iam a B.PHARMA GRADUATE from DELHI UNIVERSITY and I am looking forward for DRUG INSPECTOR EXAM..kindly mail me any ques papaers reg the same...
What is the basic requirement for preparing drug master file , like EDMF , USDMF ?