Answer Posted / motilal sahu
IT IS THE PEACK POINT IN LOAD CURV.
LOAD CURVE IS DRAWN B/W CONNECTED LOAD AND TIME
| Is This Answer Correct ? | 8 Yes | 28 No |
Post New Answer View All Answers
10 tube light connect in mcb breaker.one tube light is fault.so breaker is tribe.how fault is rectified.(using 3wire phase,earth,neutral)
How to check the thermocouple is correctly connected to cable for K type? (i,e positive pole is connected to non magnetic conductor and negative pole is connected to magnetic conductor)
what are the applications of TIG welding
hi frnz,can somebody give me any project work? i am a 2nd year student & interested in practical works...plz give me some projects
what is a composite error in current transformers, why occurs & in which it will occur i.e, either metering ct/ protection ct
I want definition for ABT Meter (Availability Based tariff) ?
please send me privious exam's queation papers of section engineer(electrical).
how to failure indution motor insulation & how to improve heat in motor insulation
What is “pu” in ee?
In what condition the HT fuse breakes?
Please brief working principle & construction of permanent magnet AC Servo motor
what is the purpose of using filters in a protective relaying scheme?
what about electrical pannel.? What is meant by plc pannel.?
Why have to use copper cable for local isolator to motor ?
What are test signals and their significance?