As an engineer, what u should do when the construction of a
building doesn't meet the required specifications?
Answer Posted / jaigopal
demolish and direct them to reconstruct.
if fisible and possible then rehabilitate the
same with guidence of expert.
Is This Answer Correct ? | 2 Yes | 6 No |
Post New Answer View All Answers
What is the ideal size of the living room ranges from small to large size?
what is difference between GTS bench mark and temporary bench mark
Gave a cantilever beam with 3 legs.Told to draw the bending moment diagrams, axial force diagrams and shear force diagrams.From BMD he asked to show how the reinforcement will be provided on the tension side.
How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 600 microns?
What are the phases inspections are done by local authority while construction?
How many Sft of Level Plaster per Kg
what is meaning of inverted beam.is it way to provide double mat in slab one at bottom and another at topif we go for provision of inverted beam. shall we construct structure with out plinth beam for us we have to construct small bus shelter
contractor receive 100 MT steel.after compliting the work the contractor refund 90 MT steel.How reconsilation of steel done?
What is Grid floor and mention its advantages ?
Required amount of Steel bars, cement/ square feet for roofing of residential building upto 3rd floor.
Reinforced concrete: suppose you are doing rough estimate for purchase of rebar for reinforced concrete slab for single stores residential building. You know total concrete volume will be 100 m3. How many tons rebar 6, 10 and 12mm will you require for the project?
Why do you want to work here
why we use aggregate,sand with cement in concrete?
what energized you to complete your course?
What goals do you have in your career?