We have 250 KVAR cacitor bank & our average load is 200kva
but our power factor is average 0.66 how can we maintane
it? how can we balance our load?
Answer Posted / zahid noor
Connecting a capacitor bank to laod is not sufficient to
control power factor, it is controlled by increasing &
decreasing value of capacitor on increase & decrease of
your load, which needs to be calculated & automatic control
can be given by APFC panels. Please contact a suitable
party .
| Is This Answer Correct ? | 3 Yes | 2 No |
Post New Answer View All Answers
WHAT IS DEAD END IN PROTECTION?
what is plunger and what's the use of it in motor alignment?
What is CCM in Electrical ? where can we use this material?
WHERE NEUTRAL WIRE IS CONNECTED AT DOMESTIC TO TRANSMISSION LINE(SINGLE PHASE TO THREE PHASE)
how to generator maintenance (A Check, B check,Etc)
Pl.brief me about Electrical power distribution system from Main generating station to Industry.What is the use of in between station.
How to measure the Harmonic Distortion of UPS ie THD?
As i want some model question paper in basic computer science and history please send me immediately sir
following are the questions asked in interviews: 1) Considering the short circuit fault, which switchgear is preferable, SFU OR MCCB? Which operates faster? whicg one is popular in Indian Market and why? 2)Define SCPD. What is type2 coodination? 3)Why the contactor rating is higher for the fuseless selection than for fuse selection? whether the ratinf of SFU or MCCB remains the same in both the cases? 4)If the HP rating is known then can you calculate the ratings of L.V Switchgear(SFU/MCCB, contactor, OLR) without using the selection chart?
how is find out kwh step by step
What is diversity factor in electric installations?
DG cranking voltage?
How to calculate the multiplying factor for energy meter with ct ratio given
how to calculate units consumption for a 12 hp motor /hr.
I AM FROM ELECTRICAL ENGINEERING ? I AM ASPIRING FOR "BHEL".HOW I HAVE TO PREPARE .ON WHICH TOPICS TO BE CONCENTRATE MORE.PLEASE GIVE FULL DETAILS OF WRITTEN EXAM.