Which of the following would be the BEST method for ensuring
that critical fields in a master record have been updated
properly?
A. Field checks
B. Control totals
C. Reasonableness checks
D. A before-and-after maintenance report
Answer Posted / antoine
B. Control totals
Is This Answer Correct ? | 1 Yes | 3 No |
Post New Answer View All Answers