Answer Posted / pati
MPS is for Final products basically planned by the Top
management for costly items with extra care. MPS can be
planned MRP materials also.
Where as MRP starts after the MSP materials decides. MRP
can plan all the materials for the Final product decided by
MPS
| Is This Answer Correct ? | 11 Yes | 3 No |
Post New Answer View All Answers
What is meant by payscale structure? How did you configure the payscale structure?
Explain 'mrp' (material requirements planning)?
We have two storage locations are ‘0001’ and ‘0600’. Default storage location in process order is always ‘0001’ what determines this default location?
a company needs 12 standard values. how it can be maintained?
What is primary cost and secondary cost?
What are the t-codes for creating, changing and summarizing bom?
What happens to planned after it has been converted into production order ?
Explain what is prt (production resource tools) in sap pp?
What are the keyfields found in mrp view 1?
what is std info set? where it is used?
Can we create production order without bom and routing ?
Integration between PP and MM Module.
How the process time is calculated in a wc when both labour, machine categories exist?
What are all the steps involved in Variant Configuration?
What are all the ‘technical types of bom’?