how do u implement scheduling in Informatica?
Answer Posted / guest
use the scheduling options in the informatica or use pmcmd
commands
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
Hi Guys, my requirement is to load 1 yr data from oracle to teradata database through abinitio etl graph.i need to schedule this as a monthly job.but i want to load 12 month data for the first time and from second time it should load last (recent) month data and delete 13th month data. For example For the first time it should load 201208 to 201108 data, second time it should delete 201108 month data and load 201209 month data. I developed garph to load 12 month data ,but i don't know how to handle above requirement as am new to abinitio. i greatly appreciate you help.Thank You.
Compare ETL & Manual development?
Define slowly changing dimensions (SCD)?
how do u identify the changed records in operational data?
what is granularity in Data ware House?
how many steps are there in etl process?
what is the use of structures?how many nodes can u create in a structure?
What are the names of the layers in etl?
what is the difference between cardinality and Nullability?
what is Forward,Reverse and Re_engineering?
Two default user groups created in the repository are____and_____.
diff b/w dwh & data mart diff b/w star schema & snow flake schema diff b/w fact table & dimension table what are the contents in requirement specification what are the docs needed for testing draw ur proj architecture
What is a mapping?
what happens if the info.server doesn't find the session parameter in the parameter file?
what is the use of server?