how do u implement scheduling in Informatica?
Answer Posted / guest
use the scheduling options in the informatica or use pmcmd
commands
Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
How to recover a workflow? What are the different approaches?( In prod i.e no access to modify)
please tell me any easy ways of testing the Data warehouse project. In my project we are not using any tools for ETL. we are writing scripts in SCRIPTELLA. And we using Pentaho tool for Reporting How can i test all these. please tell me ASAP. thanks in adavance
what is pmrep command?
Hi Guys, my requirement is to load 1 yr data from oracle to teradata database through abinitio etl graph.i need to schedule this as a monthly job.but i want to load 12 month data for the first time and from second time it should load last (recent) month data and delete 13th month data. For example For the first time it should load 201208 to 201108 data, second time it should delete 201108 month data and load 201209 month data. I developed garph to load 12 month data ,but i don't know how to handle above requirement as am new to abinitio. i greatly appreciate you help.Thank You.
What is etl tool in hadoop?
What is the difference between Data Warehousing and Data Mining?
Dear All, Can anyone tell me that from where i can get Power Center 8.5 S/W for Linux and how can i install Power Center 8.5 or any 7.x series on Linux Platform. Thanks in advance
What are the various tools used in etl?
what is a worklet?
What is etl process? How many steps etl contains?
how do u handle performance issues in Informatica . where can u monitor the performance ?
how do u estimate the depth of the session scheduling queue? Where do u set the number of maximum concurrent sessions that Informatica can run at a given time?
What is data modeling and data mining?
what is session partitioning?
explain the methodology of Data Warehousing?(Polaries)