What is the acessaries distribution transformer ?
Answer Posted / chetan
conservator,radiator,hv wdg, lv wdg,tap changer,buchoz relay
oti relay, wti relay
| Is This Answer Correct ? | 11 Yes | 4 No |
Post New Answer View All Answers
Vibromotor 252MV 1/4HP2P..what is mean by 252MV?
xpression 'document.FrmQF.myemail' [
In convertor can we use rectifier thyristor in place of invertor thyristor with explain.
Scott connection is used for A 3-phase to 2-phase conversion B to achieve higher effciency C to save copper D to reduce harmonics
Can we use a absolute encoder to show rpm of a motor ? what about the condition when power is off ? what is difference if a incremental one is used ?abanirout@gmail.com
2. Modify your design in question 1.a so that the circuit works according to the following function table X Y F 0 0 Clear 0 1 No Change 1 0 Parallel Loading 1 1 Count 3. Design a circuit that detects the pattern 010 in a serial input X considering: 3.a Overlapping 3.b No overlapping
how can i get the formula to find out the cable size if i know the load of main fuse protection.
What is block diagram?
What is time response of the control system?
how to carried out tan delta test in 11 KV alternator ?
plese send me the oces/dgfs sylabus and previous year question pattern of electrical engg.?
What is relation between transmission lines & Communication lines ?
what is POTT and PUTT explain?
In our plant we have installed new MCC with ELR and CBCT which is detecting some leakage current in the system but it leading to some confusion when to check that in which feeder which is drawing current we put off the whole panel itself but still CBCT detecting some leakage current so can anybody ans me , where i am going wrong or how to detect whether its actual leakage or CBCT malfunctioning.
(1)The demand for electricity , the amount of renewable generation available, the amount of fossil fuel generation available and the cost of the fossil fuel generation are shown in table below period(hrs) demand(MW) renewable (MW) fossil- fuel(MW) cost of fossil fuel(MW) 00.00 - 01.00 2000 1800 2000 30 01.00 - 02.00 2300 2500 2000 30 02.00 - 03.00 2500 2700 2100 45 03.00 - 04.00 2900 3100 2100 50 04.00 - 05.00 2700 2600 2500 45 05.00 - 06.00 2400 2000 2700 50 06.00 - 07.00 2200 1800 2000 36 07.00 - 08.00 2100 1600 2000 36 Assuming that the renewable generation incurs zero cost, determine an optimal generation schedule(specifying the amount of renewable generation and fossil fuel generation used in each period, the cost for each period and the overall cost for 8 hours.)