what is the difference between earthed and unearthed cable?

Answer Posted / vipul dhruv

what nirav said is right but the thing is he didn mention
on which phases the voltage will be root 3 times the phase
to ground voltage. actually it is on the other two phases
other than the faulted phase that the voltage will shoot to
1.73 times the normal phase to ground.
regards.

Is This Answer Correct ?    36 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what r the checklist while installing a 380 kva DG set

3319


Hi,iam a diploma in electrical engineering.rtd from indian air force in apr 2007.prsently working in reliance next link as a network maintenance engineer since 2007,can i get a job in motherson sumi.

1901


WHAT IS THE WORKING PRINCIPLE OF A GENERATER.how is a GTG (Gas TURBANE Generater) working.plz explane

2059


What is meant by sag?

651


how we test a 3 phase motor on single phase supply....? HOW WE RUN A 3 PHASE MOTOR ON SNIGLE PHASE. supply for testing..? how we verify of a 3 phase motors 6 wire & name thame a1/a2/a3..b1/b2/b3 and c1/c2/c3 for connecting star delta starter ........i have only 1 phase supply ? help forum..........

4415






why tertiary winding is used in transformer with diagram?

1788


Define ohm’s law for a.c (alternating current)?

628


sir,in our plant we r using SATEC PM172E power reading meeters in HT panel side it is monitoring the MB data smart viewer(sever).but last one week we did not get readings inthe server only available in meeter.tell me how communicate meter and server. and also what steps we take for checking.

1786


i have flexible wire. size of conductors is 0.190 mm & no.of conductors are 48. then size of wire comes 1.37 sqmm instead of 1.5 sqmm . the what is tolerance for this size.

1323


What is the function of NGR for the parallel operation of alternator? whats happen when different rating of alternator are running with parallel?

2488


Define what is power quality meter ?

660


An ISP is granted a block of addresses starting with 150.80.0.0/16. The ISP wants to distribute these blocks to 2600 customers as follows. a) 200 medium size businesses; each needs 16 addresses b) 400 small businesses; each needs 8 addresses c) 2000 households; each needs 4 addresses Design the subblocks and give the slash notation for each subblock. Find out how many addresses are still available after these allocations.

7015


State Maximum Power Transfer theorem.

727


What do you mean by an instrument transformer?

651


what is control supply rating of a machine

1491