Answer Posted / poornima
these variables allows to specify constants that can be
used throughout the project. The constants can be specified
and changed while designing and testing your project.
| Is This Answer Correct ? | 14 Yes | 10 No |
Post New Answer View All Answers
What is tibco?
What is process name dynamic override?
Which activity is used for detecting duplicate message processing?
What activities are supported in xa transaction ?
What is import and include in schema in tibco bw?
How to control the sequence of execution of process instances created by a process starter ?
What is the difference between publish by value and publish by reference?
Can there be two error transitions out of an activity ?
What is the functionality of the retrieve resources resource?
What is the role of tra?
What are the options for configuring storage for process engine's checkpoint repository ?
If there are two sub processes then how can we call at a time one sub process dynamically by using call process?
If there are Senders who are sending messages on a queue. And these messages are not yet received by the consumers. They are still lying in the server. But before the consumers could receive the message the server went down. Since they are persistent messages, they are saved. But when secondary comes up how will the secondary server will get the message because it’s a different machine. How will it get the messages which are with the Primary server?
What are the cases where business process cant proceed correctly subsequent to restart from a checkpoint ?
What is custom id?