How can we explain about matrics..Every time iam getting
this question..Have you involved in metrics??..Plz..plz
Can any anybody give the sugessions..What is the best way
to explain about metrics..give me your valuble
answer..thanks in advance...
Answer Posted / sathya
Metrics are the derived value from the base measures.
Base measures are nothing
but "effort,defects,schedule,requirements,test
cases,project size."
Using the base measures, you can track the project's status
quantitatively(thro' different metrics).
Here you can refer this example(for calculating the
metrics "productivity") :
Formulae: Productivity = Project size/ effort(in person
days)
so for e.g. if the project size is 300 FP(functional
points) & the actual effort in person days is 30, then the
productivity will be 10.(i.e.300/30)
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
Which was the most interesting bug you found.
can any one post the format of tracebility martrix Plz...... Maid Id: sandhya.shyamala@yahoo.com
Can anybody give me some tips on how to face telephonic interview and Write some expected telephonic questions as a 2+yr exp. in testing. Try to give Ques. that u already hv faced in telephone. Plz Help me out friends.
Is quality control similar to quality assurance?
wat is meant by frontend and backend testing
What is the difference between qa, qc, and testing?
what are the tests u did in entire project? when it did in the project? (means at the release build to end of project) plz explain clearly
how many meeting in realtime environment? what are they?plz explain?
What is Traditional testing & Object Oriented testing?
What are the different levels of manual testing?
Why we have to do manual testing?
What are the principles of software testing?
What are parametere require for Performance testing?
what is quality Factor
what are the risk factors in the project? what is the base for testplan and entry criteria ,exit criteria for test plan?