Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

WHAT ARE PERFORMANACE SETTINGS YOU HAVE IMPLEMENTES IN YOUR
PROJECT?

Answer Posted / kiran

1.In drvition ,Instead of calling routines implementing
stage variales.
2.while using ODBC Stag,adjust as per row seetings.
3.using user defined queiries while Extract the date from
sorce.
4.minimize null values
5.minimize unused columns
6.minimize warninigs
7.don't use more than 7 look up in a job,if exceede take
another transformer.
8.don't use morethan 20 stages in a job.
9.before loading data drop indexes after re created indexes.
10.worked with DBA-Admin for
11.tuned in Project tunes in Datastage Admin
12
13
14
15
16

Is This Answer Correct ?    4 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

1)How will u implement SCD2 by using surrogate key. 2)What are the disadvantages with surrogate key. 3)How will you handle nulls in your project for the varchar, integer data types. 4)Can I use two fact tables in star schema. 5)3 jobs are running on the 2 nodes after I added one more node so can I compile those jobs to run on three nodes.

4044


Difference between IBM DATA STAGE8.5 and DATA STAGE9.1 ?

3794


Demonstrate experience in maintaining quality process standards?

2552


Can you filter data in hashed file?

3772


What is the difference between validated and compiled in the datastage?

1293


What are the different options associated with dsjob command?

1439


What are the some differences between 7.x and 8.x version of datastage?

1255


Whats difference betweeen operational data stage (ods) and data warehouse?

1116


what is the use of surogate key in datastage

2310


i have a job with 3 possibiliies finish with ststus ok abbort warning how do you handle these 3 in job sequence? explain the situation where you have appiled scd in your project? chandu

2722


What are the important features of datastage?

1127


What is the difference between in process and inter process?

1147


how to delete one row in target dataset

3122


whom do you report?

1930


create a job that splits the data in the Jobs.txt file into four output files. You will direct the data to the different output files using constraints. • Job name: JobLevels • Source file: Jobs.txt • Target file 1: LowLevelJobs.txt − min_lvl between 0 and 25 inclusive. − Same column types and headings as Jobs.txt. − Include column names in the first line of the output file. − Job description column should be preceded by the string “Job Title:” and embedded within square brackets. For example, if the job description is “Designer”, the derived value is: “Job Title: [Designer]”. • Target file 2: MidLevelJobs.txt − min_lvl between 26 and 100 inclusive. − Same format and derivations as Target file 1. • Target file 3: HighLevelJobs.txt − min_lvl between 101 and 500 inclusive. − Same format and derivations as Target file 1. • Rejects file: JobRejects.txt − min_lvl is out of range, i.e., below 0 or above 500. − This file has only two columns: job_id and reject_desc. − reject_desc is a variable-length text field, maximum length 100. It should contain a string of the form: “Level out of range: ”, where is the value in the min_lvl field. My Question is how do you write the stage variable for reject rows.

2722