In R/3,is it possible to substitute one product for another?
If so, how it can be achieved?
Answer Posted / mahesh
This can be done thru procedure called Material
determination.Here u will have to proceed the way create a
c onidtion access seq etc and create a conidtion record.
where u mention the main item and the to be susbtituted
product.You can also specify the validity of this
procedure. do not forget to assign the procedure to the
document type.
Regards
Mahesh
Is This Answer Correct ? | 15 Yes | 0 No |
Post New Answer View All Answers
Hi my name is subharajyoti and i have 6 yrs of exp in technical sale and at present doing sd module trainig in bangalore, i am looking for exp in real time projects, pls help me out
Where do you define unloading points and goods receiving hours?
What is higher level item category?
What is the structure of delivery document? What are the characteristics essential for combining more than one sales order as one outbound delivery?
accounting document is not getting generated for sto process. where is the control for this ? Thanks in advance
what is consignment stock process?
What does the term “business area” refer to and how can it be used?
how you can assign distribution channel to sales organization?
Have you worked on interfaces? what are the?
how can you do consignment in inter company sales?
I have created value contract with order type WK1 in VA41. The target value is 500 USD and the net price is 1000 USD. There was no pop up message or error thrown while saving the contract when the net price exceeded the target value. And the system allowed to save the contract. Is there any configuration available to activate the warning or error message or any enhancement need to be done?
Tell me about your EDI/IDOC experience?
What are the configurations steps for packing?
What is product attributes in sap sd?
what is the role of sap sd fuational consultant in IDoc prepairtion,explan the IDoc process ( my email id umerimran12@gmail.com.)Plz help sd gurus