what is the highest transmission voltage in india???

Answer Posted / sharad

765kv for A.C.
800kv for D.C.

Is This Answer Correct ?    35 Yes 20 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

If we have 11 kv RYB Phase single core cable near about. Then wht effect and losses

1359


What is the earth treantment procedure?

1626


how to failure indution motor insulation & how to improve heat in motor insulation

1426


What are the special cables required for explosion proof wiring?

15673


HOW TO CALCULATE THE HEAT AND LOAD OF LT-SUBSTATION WHICH CONTAINS 2*1MVA TRANSFORMERS,LT-SWITCH BOARD,MLDB,ACB,BUSBAR,ETC,......?

1633






Why cables and busbar both needed in LT Panels?

1754


what is acceptance test in electrical engineering.

1715


Sir, I have applied for the of Jr.engineer(Electrical & Electronics) & ASST. LOCO PILOT at ALL RRB BOARDS. please send me all RRB Boards solved papers in the year of 2001 tO till date. i requested send me the papers to my id as soon as possible (jet_0991@yahoo.com). (This is very urgent) Thank You,

1411


What are the various types of BUSBAR Schemes? explain each

4598


What is difference between Sample test and Routine test in safety standard?

1303


Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.

1577


How many kw will suply from one db

1079


a starter used for squirrel cage induction motor?

1223


What is dielectric loss?

659


Damping resistor provided in open delta (tartiary) winding of a measuring PT at the incoming of a MV inverter drive panel is getting heated up. Can any body explain the reasons and suggest the remedy?

2551