1)what is the use of Deployement and Scheduling?
2)If you have a prompt in your report , after scheduling the
report will it run?
3)How can we move our reports from one Environment to
Another Environment?
4)What is the complex report in your project and whar are
the critical issues have u faced in u r reports and tell me
name of some recent reports have u created?
5)What are the limitations of value prompts?
Answer Posted / srinu
deployment:moving an application from 1environment to
another(ex:dev to testing envi)
scheduling :we can run a report at later time at non peak
hrs.while scheduling we 'll select prompt values in
scheduling tab so that data displayed acc to prompt.
complexity of reports in developing cdnl blocks &morecals.
limitations of value prompt is we cant diplay morethan
5000values at a time
| Is This Answer Correct ? | 7 Yes | 0 No |
Post New Answer View All Answers
What is Metrics designer?
how the values be passed to prompts in report studio? when a data item is dragged n dropped in to report, after the default query generated first which sql will the query query hit for processing means (native or cognos)? plz answers to these questions?
What do you mean by query studio?
how you migrate reports to cognos 8 from previous versions?
how do you deploy a report in cognos 8 to run in maximo6? what r the steps in maximo??
What is the difference between the content store and content manager?
What is the difference between ‘macro’ and ‘prompt?
How is possible this scenario using in type-in prompt.?
How can you link a query to a data container manually in Report Studio?
All ready we have alias tables for modifications why we are using views if anybody this answer plz reply me
how can we Upgrad the reports from version Impromptu 6.0 to 7.0 and Power Play from version 6.6 to 7.0 ?
What is a Folder?
What are the advantages of cognos?
Can you define cognos impromptu?
How to Reset Pagenumbers in one report.