hi frnds i hav got thro BHEL written exam..wat to prepare
for intervw..guide me plz!!!!!!!!!!!!!
Answer Posted / renu
learn your foi well... anybody knows wen s the results....?
| Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
what are the cube & Sylinder strength of concret M20,M25,M30,M35,M40,M60 ,M75,M10 ,M15
what is difference between GTS bench mark and temporary bench mark
I need Bhel engineertrainy test papers in civil engineering please send to email id - hisandy66@gmail.com
I have a slab of 20cm thickness of 20m by 4m in wich we are installing 15 tons electric panels , and we have put 4 H-shaped columns under the slab but we have done many cores in the slab which seems very normal , can you help me by telling me how to calculate the bearing capacity of the slab or give me an idea if i should increase more columns Note: load distribution area 12*1.5 m2
Calculate the maximum allowable speed on a horizontal curve of radius 350m if the maximum allowable values of the lateral coefficient of friction are 0.14 and the rate of superelevation is 0.08.
What is the release of lien?
What is the cemnent ratio
For the construction project what capital cost has to be taken in consideration?
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)
(Project Management Topic) What are the important criteria in the successful realization of the project?
kindly mail me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates plz send my email id- VMANDAL91@gmail.com
what are the duties of Site Engineer in work site?
what is pouring and explain
How many days should curing of plastering, brick work and concrete