When I am saving customer master (internal number range),
system generating number range like 5000211,500216and 500221
instead of giving 500211,500212 and 500213.why system
generating like this?
Answer Posted / rohan
Hi,
Please check for the number range field in sales document
type i.e. t-code vov8
Menu Path: SPRO>>Sales & Distribution>>Sales
Document>>Sales Document Header>>Sales document type
Thanks
| Is This Answer Correct ? | 1 Yes | 7 No |
Post New Answer View All Answers
Differentiate between shipping point and loading point.
What is backorder processing or partial delivery?
Name three areas/processes which use condition technique in sd?
Explain ‘business area’?
I was faced these interview questions, please provide answer with your real life experience SAP gurus. 1. As a SAP SD consultant how did you integrate/interact with MM and FI/CO? 2. Tell me about your OTC process expreience? 3. How have you used MASS tool in your last project, and to upgrade what data? 4. Tell me about your EDI/IDOC experience? PLease answer any/all questions as per your wish. Thank you very much in advance, god bless.
How to create the source and target database connections in the server manager?
what are the stages involved in VALUE SAP. please brief it
Define the material taxes in ovk4, which will then be maintain in material master.
What is item category and how is it determined?
To what do you assign distribution channels and divisions?
What is difference between delivery document & scheduling?
1) What are the Stock transfer configuration steps ? 2) What is a function of account group except partner fuction creation ? 3) Tell me some critical Gaps(not basic one) which u faced in project and how u solved it ? 4) Tel me about u r bisiness flow and sales process ? 5) What is formula in pricing ? 6) What is a difference between Make to stock and Order to cash ?
What is ‘consignment stock processes'?
Hi SD Experts, Have you created or generated any Routines/ Requirements for your client? Tell me the detailed procedure, Path, T-codes along with detailed explanation & steps and logic behind your resolution and finally your resolution to the requirement in SAP ECC 6.0 version? Please give as many examples as possible from your real time live data with reference to your client / project? It’s Urgent!!!!!! I have interview within 1-2 days? So, I request you to provide solutions to above question as early as possible? Your timely help would be greatly appreciated? Thanks in advance Regards
Do you know what’s availability check is?