What is think time? How do you change the threshold?
Answer Posted / mahesh sv
Think time is the time that a real user waits between
actions. Example: When a user receives data from a server,
the user may wait several seconds to review the data before
responding. This delay is known as the think time. Changing
the Threshold: Threshold level is the level below which the
recorded think time will be ignored. The default value is
five (5) seconds. We can change the think time threshold in
the Recording options of the Vugen.
| Is This Answer Correct ? | 25 Yes | 5 No |
Post New Answer View All Answers
Why we insert the rendezvous point while running the scenario?
What are monitors?
What the host attributes determine?
What is elapsed time in load runner?
What is the latest version and language used in load runner?
What are the different types goals in goal-oriented scenario?
How can we invoke a parellel process in load runner using C or perl language?
What is protocol function?
What are the four selection methods when choosing data from a data file?
What in percentile graph?
How to upload media use loadrunner? I record the script but it fail because the top of document is invalidation.How to solve the problem?Which one know the answer please tell me. Thanks!
What is pause command?
How do you load a load runner agent?
What are the different sections of the script? In what sequence do these sections run?
What is extended log?