Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is divercity factor?

Answer Posted / nitesh kurdia

The ratio of the sum of the individual non-coincident
maximum demands of various subdivisions of the system to
the maximum demand of the complete system.

Sum of Individual Max. Demands
diversity factor=--------------------------------
Max. Demand on Power Station

Is This Answer Correct ?    32 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

(1)The demand for electricity , the amount of renewable generation available, the amount of fossil fuel generation available and the cost of the fossil fuel generation are shown in table below period(hrs) demand(MW) renewable (MW) fossil- fuel(MW) cost of fossil fuel(MW) 00.00 - 01.00 2000 1800 2000 30 01.00 - 02.00 2300 2500 2000 30 02.00 - 03.00 2500 2700 2100 45 03.00 - 04.00 2900 3100 2100 50 04.00 - 05.00 2700 2600 2500 45 05.00 - 06.00 2400 2000 2700 50 06.00 - 07.00 2200 1800 2000 36 07.00 - 08.00 2100 1600 2000 36 Assuming that the renewable generation incurs zero cost, determine an optimal generation schedule(specifying the amount of renewable generation and fossil fuel generation used in each period, the cost for each period and the overall cost for 8 hours.)

1853


What is trip and closing coil in cb? Why need of them

1507


You are of electrical field and you are going for software? Why

2308


Describe Non I.S. Earth System and why is it used?

1781


anyone knows service engineer in chennai for EDM SPARKING MACHINE.CHMER PULSE CD 60 M.pL GIVE ANY CONTACT NOS

2408


what is the soft starter principle? how is connection diagram? what is the procedure for checking the connection?

2158


State the types of distortions in amplifier?

1196


If the feeder rating is 7.5 kw or 10 HP star-delta feeder, MCCB is taken as 63 a, contactors-32 a, how much will be the OLR rating or which range OLR should be considered when we concern about type-2 coordination?

2309


CAN WE CALCULATE THE NEGATIVE SEQUENCE AND ZERO SEQUENCE REACTANCE OF A GENERATOR USING ONLY ITS RATED VOLTAGE, KW, PF AND SYNCHRONOUS REACTANCE??? IF YES, THEN HOW??

5624


How to calculate that clean water supply in one Day from 150 KLD STP?

2000


IF 8255 CONTROL WORD IS 94H,Tell the chip port work mode ?

2562


why zero sequence impedance measurement is not applicable for single phase GT

2188


if any house we instaled a 1.5 ton ac and its phase cable of wiring is installed but netrual cable of wiring not instaed. my question is that is neutual of house(for other wiring is capable for ac load or a sepeart neutrual wiring required

2466


How to work E.L.C.B and how to connect in circuit.

2009


sir plz send some previous year questions of jspl.

1923