What is interaction or interface bet PP with FICO and PP with SD

Answer Posted / klmcsc

For pp and fico interaction

product costing,cost roll up,

Is This Answer Correct ?    14 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what do you mean by opening periods

598


How to create object dependencies in a bom for a configurable material?

614


Scheduling times can be defined in the material master record by?

599


We want the system to run a single level mrp automatically on receipt of the sales order. How to configure triggering event based mrp?

686


What are the types of master views for production and planning?

675






What change management functions do you require? How do you want to define the validity of BOMs (based on date/freely definable parameters)? Must existing change histories be transferred to the R/3 System?

1718


What are traffic lights in mrp?

736


Explain the mrp controller and their uses.

609


What is the difference between indian and us payroll?

604


What are the different type of BOM usage?

1245


Can we use the same routine for materials undergoing the same process/operations? Can we avoid separate routing for each and every material produced?

605


What is the use of t-code cs20 in bom?

704


Integration between PP and PM module.

1172


What is Material status and which view of the material master it is available?

1026


What is 'mps' (master production scheduling)?

706